Preflight Procedures

Private Pilot Balloon PTS · Area of Operation II

  • PBH.II
  • Area 2 of 8
  • 7 tasks
  • FAA-S-8081-17A
PBH.II.A

Launch Site Selection Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to launch site selection. 2. Arranges to launch with adequate time to complete the flight safely considering wind, weather conditions, and landing sites. 3. Selects a launch site with emphasis on— a. suitable landing areas. b. airspace considerations. c. surface wind and winds aloft. d. accessibility. e. surface condition. f. size. g. hazards and obstacles in the vicinity of the site. 4. Makes a competent “go/no-go” decision considering all of the factors involved in the selection of a safe launch site.

PBH.II.B

Crew Briefing and Preparation Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to crew briefing and preparation. 2. Designates a crew chief, if appropriate, and assigns each crewmember specific duties and responsibilities, considering the experience level of each crewmember. 3. Briefs crewmembers in all areas of the flight, including layout and assembly; tie-off, if appropriate; inflation; in-flight; landing; recovery; and emergency procedures. 4. Establishes a common means of communication such as hand signals and/or two-way radio. 5. Describes the proposed direction of flight and the estimated time aloft. 6. Ensures that all necessary equipment is on board. 7. Supervises and coordinates all activities. 8. Completes the appropriate checklist.

PBH.II.C

Layout and Assembly Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to layout and assembly. 2. Positions balloon properly, considering wind conditions and obstacles. 3. Checks fuel system for security, leaks, and correct fuel pressure. 4. Uses tie-off, if appropriate. 5. Assembles balloon as appropriate. 6. Completes the appropriate checklist.

PBH.II.D

Preflight Inspection Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to visual inspection. This shall include which items must be inspected, the reasons for checking each item, and how to detect possible defects. 2. Inspects the balloon with reference to the checklist emphasizing the— a. basket. b. fuel system. c. flight instruments. d. items. e. envelope. f. venting and/or deflation systems. 3. Verifies the balloon is in condition for safe flight. 4. Completes the appropriate checklist.

PBH.II.E

Inflation Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to inflation. 2. Accomplishes the proper tie-off procedure, if appropriate. 3. Inflates the balloon to equilibrium as appropriate. 4. Positions and secures the vent/deflation lines. 5. Completes the appropriate checklist.

PBH.II.F

Basket/Gondola Management Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to basket/gondola management procedures. 2. Ensures all loose items in the basket/gondola are secured. 3. Briefs passengers on the proper boarding, in-flight, and landing behavior and procedures. 4. Organizes material and equipment in a logical, efficient manner. 5. Utilizes all appropriate checklists.

PBH.II.G

Pre-Launch Check Members

To determine that the applicant: 1. Exhibits knowledge of the elements related to the pre-launch check. This shall include the reasons for checking each item and how to detect malfunctions. 2. Reviews the wind conditions, temperatures, and obstructions. 3. Divides attention inside and outside the basket/gondola. 4. Performs final instrument check. 5. Ensures that the vent/deflation lines are positioned and secured properly. 6. Determines equilibrium. 7. Accomplishes the pre-launch check and confirms that the balloon is in safe operating condition. 8. Accomplishes final coordination with the ground crew, including signals and emergency procedures. 9. Assures no conflict with traffic prior to launch. 10. Completes the appropriate checklist.