PA.XII.BFAA-S-ACS-6C · Nov 2023
Seaplane Post-Landing Procedures (ASES, AMES)
To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with anchoring, docking, mooring, and ramping/beaching. Note: The evaluator must select at least one after-landing procedure (anchoring, docking and mooring, or ramping/beaching).
Bottom line
After landing, secure the seaplane to allow safe unloading and to keep winds and currents from moving it around.
FAA references
- SEA ch. 6 (pp. 6-8–6-9) — FAA-H-8083-23
- AFH ch. 17 (p. 17-15) — FAA-H-8083-3C
- SEA ch. 6 (p. 6-10) — FAA-H-8083-23
Knowledge
- PA.XII.B.K1: Mooring.
- PA.XII.B.K2: Docking.
- PA.XII.B.K3: Anchoring.
- PA.XII.B.K4: Beaching/ramping.
- PA.XII.B.K5: Postflight inspection, recording of in-flight/postflight discrepancies.
Risk management
- PA.XII.B.R1: Activities and distractions.
- PA.XII.B.R2: [Archived]
- PA.XII.B.R3: Seaplane base specific security procedures, if applicable.
- PA.XII.B.R4: Disembarking passengers safely on the ramp and monitoring passenger movement while on the ramp.
Skills
- PA.XII.B.S1: If anchoring, select a suitable area considering seaplane movement, water depth, tide, wind, and weather changes. Use an adequate number of
- PA.XII.B.S2: If not anchoring, approach the dock/mooring buoy or beach/ramp in the proper direction and at a safe speed, considering water depth, tide, c
- PA.XII.B.S3: Complete the appropriate checklist(s).
- PA.XII.B.S4: Conduct a postflight inspection and document discrepancies and servicing requirements, if any.
- PA.XII.B.S5: Secure the seaplane considering the effect of wind, waves, and changes in water level, or comply with applicable after landing, parking, and
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Task bottom line
- Check your understanding with answers you can reveal