AI.VII.GFAA-S-ACS-25 · Nov 2023

Confined Area Takeoff and Maximum Performance Climb (ASES, AMES)

ACS task objective

To determine the applicant understands confined area takeoff and maximum performance climb, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.

Bottom line

An instructor can prompt a learner to conduct a confined or obstacle clearance takeoff by specifying where an imaginary obstacle exists. If the departure path from a confined water area leads over high terrain, consider circling back over the water after takeoff to gain altitude.

FAA references

  1. SEA — FAA-H-8083-23
  2. SEA ch. 4 (p. 4-16) — FAA-H-8083-23
  3. AIH ch. 10 (p. 10-8) — FAA-H-8083-9B
  4. SEA ch. 6 (p. 6-8) — FAA-H-8083-23
  5. AIM 7-6-7 (Mountain Flying) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
  6. PHAK ch. 5 (p. 5-42) — FAA-H-8083-25C (2023)

Knowledge

Risk management

Skills

Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Task bottom line
  • Check your understanding with answers you can reveal
View membership options