AI.VII.G.S3FAA-S-ACS-25 · Nov 2023Skills
Verify assigned/correct takeoff path.
Verify assigned/correct takeoff path.
Bottom line
Evaluation of the landing area should include approach and departure paths. Be certain the departure path allows sufficient room for safe terrain clearance or for a wide climbing turn back over the water. If the departure path leads over high terrain, consider circling back over the water after takeoff to gain altitude.
FAA references
- AFH ch. 7 (p. 7-1); Glossary (p. G-18) — FAA-H-8083-3C
- SEA ch. 4 (p. 4-12) — FAA-H-8083-23
- SEA ch. 6 (p. 6-8) — FAA-H-8083-23
- SEA ch. 4 (p. 4-16) — FAA-H-8083-23
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Standard; Meeting it; Deviations; Practice
- Check your understanding with answers you can reveal