PA.I.B.K3cFAA-S-ACS-6C · Nov 2023Knowledge
c. Kinds of Operation Equipment List (KOEL)
Equipment requirements for day and night VFR flight, including: c. Kinds of Operation Equipment List (KOEL)
Bottom line
A Kinds of Operations Equipment List identifies equipment required for specified operations, such as day/night or VFR/IFR, for that aircraft. Consult the actual aircraft list; it is not an MEL authorizing deferrals.
FAA references
- 14 CFR 91.213(d)(2)(ii) — Current eCFR checked 2026-11-05
- 14 CFR 91.213(d)(2) — Current eCFR checked 2026-11-05
- 14 CFR 91.213(d)(3), (4) — Current eCFR checked 2026-11-05
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Use the intended kind of operation; An installed landing light fails
- Check your understanding with answers you can reveal