IR.I.C.R5FAA-S-ACS-8C · Nov 2023Risk management
Limitations of air traffic control (ATC) services.
Limitations of air traffic control (ATC) services.
Bottom line
Flight crews must understand that terrain clearance cannot be assured by ATC when aircraft are operating at altitudes that are not served by Center or approach radar. When a pilot is uncertain of an ATC clearance, that pilot shall immediately request clarification from ATC.
FAA references
- PHAK ch. 15 (p. 15-7) — FAA-H-8083-25C (2023)
- IPH ch. 4 (p. 4-15) — FAA-H-8083-16B
- PHAK ch. 14 (p. 14-24) — FAA-H-8083-25C (2023)
- RMH ch. 6 (pp. 6-3–6-4) — FAA-H-8083-2A
- IFH ch. 10 (p. 10-2) — FAA-H-8083-15B
- AIM 5-5-15 (Minimum Fuel Advisory) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
- RMH ch. 3 (p. 3-8) — FAA-H-8083-2A
- 14 CFR 91.123 (Compliance with ATC clearances and instructions.) — eCFR current as of 2026-03-05
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Hazard; How it shows up; Decision rules; Mitigations; The hazard
- Check your understanding with answers you can reveal