CA.XI.BFAA-S-ACS-7B · Nov 2023

Seaplane Post-Landing Procedures (ASES, AMES)

ACS task objective

To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with anchoring, docking, mooring, and ramping/beaching. Note: The evaluator must select at least one after-landing procedure (anchoring, docking and mooring, or ramping/beaching).

Bottom line

After landing, secure the seaplane to allow safe unloading, as well as to keep winds and currents from moving it around. Anchoring uses a heavy hook connected to the seaplane by a line or cable.

FAA references

  1. SEA ch. 6 (p. 6-8) — FAA-H-8083-23
  2. AFH ch. 17 (p. 17-15) — FAA-H-8083-3C
  3. SEA ch. 6 (p. 6-10) — FAA-H-8083-23

Knowledge

  • CA.XI.B.K1: Mooring.
  • CA.XI.B.K2: Docking.
  • CA.XI.B.K3: Anchoring.
  • CA.XI.B.K4: Beaching/ramping.
  • CA.XI.B.K5: Postflight inspection, recording of in-flight/postflight discrepancies.

Risk management

Skills

Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Task bottom line
  • Check your understanding with answers you can reveal
View membership options