CA.VIII.B.S1FAA-S-ACS-7B · Nov 2023Skills

Operate the pressurization system, if equipment is installed.

ACS element text (the applicant demonstrates understanding of)

Operate the pressurization system, if equipment is installed.

Bottom line

Particular attention should be given to the aircraft’s fuselage, windshields, window panels, and canopies to identify any cracks or damage that could rupture under the stress of cabin pressurization. Throughout the entire climb and cruise above 25,000 ft MSL, emphasis should be given to monitoring cabin pressurization. Careful monitoring of pressurization levels is essential during the descent to avoid the onset of hypoxia from a slow decompression.

FAA references

  1. AC 61-107, para. 2-12 — AC No: 61-107B
  2. AC 61-107, para. 2-11 — AC No: 61-107B
  3. PHAK ch. 7 (p. 7-36) — FAA-H-8083-25C (2023)
  4. PHAK ch. 7 (p. 7-37) — FAA-H-8083-25C (2023)
  5. AC 61-107, para. 2-7 — AC No: 61-107B
  6. RMH ch. 7 (p. 7-1) — FAA-H-8083-2A
  7. PHAK ch. 7 (p. 7-35) — FAA-H-8083-25C (2023)
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Standard; Meeting it; Deviations; Practice
  • Check your understanding with answers you can reveal
View membership options