CA.VIII.B.S1FAA-S-ACS-7B · Nov 2023Skills
Operate the pressurization system, if equipment is installed.
Operate the pressurization system, if equipment is installed.
Bottom line
Particular attention should be given to the aircraft’s fuselage, windshields, window panels, and canopies to identify any cracks or damage that could rupture under the stress of cabin pressurization. Throughout the entire climb and cruise above 25,000 ft MSL, emphasis should be given to monitoring cabin pressurization. Careful monitoring of pressurization levels is essential during the descent to avoid the onset of hypoxia from a slow decompression.
FAA references
- AC 61-107, para. 2-12 — AC No: 61-107B
- AC 61-107, para. 2-11 — AC No: 61-107B
- PHAK ch. 7 (p. 7-36) — FAA-H-8083-25C (2023)
- PHAK ch. 7 (p. 7-37) — FAA-H-8083-25C (2023)
- AC 61-107, para. 2-7 — AC No: 61-107B
- RMH ch. 7 (p. 7-1) — FAA-H-8083-2A
- PHAK ch. 7 (p. 7-35) — FAA-H-8083-25C (2023)
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Standard; Meeting it; Deviations; Practice
- Check your understanding with answers you can reveal