CA.IV.L.R3FAA-S-ACS-7B · Nov 2023Risk management
Planning for a go-around and rejected landing.
Planning for a go-around and rejected landing.
Bottom line
An attempt to climb prematurely may result in the airplane not being able to climb or even maintain altitude at full power.
FAA references
- AFH ch. 9 (p. 9-11) — FAA-H-8083-3C
- AFH ch. 9 (p. 9-12) — FAA-H-8083-3C
- AFH ch. 13 (p. 13-22) — FAA-H-8083-3C
- AFH ch. 5, Cross-Control Stall (p. 5-20) — FAA-H-8083-3C
- AFH ch. 9 (p. 9-10) — FAA-H-8083-3C
- AIM 5-4-21 (Missed Approach) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: How it shows up; Decision rules; Mitigations; The hazard; How it shows up
- Check your understanding with answers you can reveal