CA.IV.C.S11FAA-S-ACS-7B · Nov 2023Skills

Configure the airplane after a positive rate of climb has been verified or in accordanc...

ACS element text (the applicant demonstrates understanding of)

Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.

Bottom line

The applicant exhibits the skill to: Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.

FAA references

  1. PHAK ch. 5 (p. 5-12) — FAA-H-8083-25C (2023)
  2. AIM 7-6-8 (Use of Runway Half-way Signs at Unimproved Airports) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Meeting it; Deviations; Practice
  • Check your understanding with answers you can reveal
View membership options