AI.XII.G.S9FAA-S-ACS-25 · Nov 2023Skills

Complete the appropriate checklist(s).

ACS element text (the applicant demonstrates understanding of)

Complete the appropriate checklist(s).

Bottom line

If workload permits, then accomplish the “Securing Failed Engine” checklist items to turn off systems and accessories no longer required. During training and pilot certification, where the manufacturer's checklist calls for propeller feathering in a power-off situation, the pilot should set sufficient power to provide the performance that would be expected with the propeller feathered.

FAA references

  1. AFH ch. 9 (p. 9-29) — FAA-H-8083-3C
  2. FAAP874066 Landing Gear Selected Up, OEI Climb Performance Adequate — FAA-P-8740-66
  3. PHAK ch. 2 (p. 2-19) — FAA-H-8083-25C (2023)
  4. PHAK ch. 2 (p. 2-20) — FAA-H-8083-25C (2023)
  5. AFH ch. 9 (p. 9-25) — FAA-H-8083-3C
  6. AIH ch. 3 (p. 3-33) — FAA-H-8083-9B
  7. PHAK ch. 2 (p. 2-24) — FAA-H-8083-25C (2023)
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Standard; Meeting it; Deviations; Practice
  • Check your understanding with answers you can reveal
View membership options