AI.VII.K.R3bFAA-S-ACS-25 · Nov 2023Risk management

b. Potential engine failure in takeoff/climb phase of flight

ACS element text (the applicant demonstrates understanding of)

Abnormal operations, including planning for: b. Potential engine failure in takeoff/climb phase of flight

Bottom line

The applicant explains and teaches how to identify and manage risk associated with: Abnormal operations, including planning for: Potential engine failure in takeoff/climb phase of flight.

FAA references

  1. PHAK ch. 5 (p. 5-12) — FAA-H-8083-25C (2023)
  2. RMH ch. 3 (p. 3-1) — FAA-H-8083-2A
  3. SEA ch. 4 (p. 4-16) — FAA-H-8083-23
  4. AIM 7-6-7 (Mountain Flying) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
  5. PHAK ch. 9 (p. 9-4) — FAA-H-8083-25C (2023)
  6. PHAK ch. 5 (p. 5-42) — FAA-H-8083-25C (2023)
  7. AFH ch. 9 (p. 9-29) — FAA-H-8083-3C
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Hazard; How it shows up; Decision rules; Mitigations; The hazard
  • Check your understanding with answers you can reveal
View membership options