AI.VII.H.R3FAA-S-ACS-25 · Nov 2023Risk management

Planning for a go-around and rejected landing.

ACS element text (the applicant demonstrates understanding of)

Planning for a go-around and rejected landing.

Bottom line

Situations such as air traffic control (ATC) requirements, unexpected appearance of hazards on the runway, overtaking another airplane, wind shear, wake turbulence, mechanical failure, or an unstable approach are all reasons to discontinue a landing approach.

FAA references

  1. AFH ch. 9 (p. 9-11) — FAA-H-8083-3C
  2. AFH ch. 9 (p. 9-12) — FAA-H-8083-3C
  3. AFH ch. 9 (p. 9-10) — FAA-H-8083-3C
  4. AFH ch. 16 (p. 16-22) — FAA-H-8083-3C
  5. AFH ch. 13 (p. 13-22) — FAA-H-8083-3C
  6. AFH ch. 5, Cross-Control Stall (p. 5-20) — FAA-H-8083-3C
  7. SEA ch. 6 (p. 6-8) — FAA-H-8083-23
  8. AIM 4-3-11 (Pilot Responsibilities When Conducting Land and Hold Short Operations (LAHSO)) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: Hazard; How it shows up; Decision rules; Mitigations; The hazard
  • Check your understanding with answers you can reveal
View membership options