AI.VII.D.R3aFAA-S-ACS-25 · Nov 2023Risk management
a. Rejected landing and go-around
Planning for: a. Rejected landing and go-around
Bottom line
Although the need to discontinue a landing may arise at any point in the landing process, the most critical go-around is one started when very close to the ground. When the decision to go around is made, the throttles should be advanced to takeoff power and pitch adjusted to arrest the sink rate.
FAA references
- AFH ch. 9 (p. 9-11) — FAA-H-8083-3C
- AFH ch. 9 (p. 9-12) — FAA-H-8083-3C
- AFH ch. 9 (p. 9-24) — FAA-H-8083-3C
- AFH ch. 13 (p. 13-22) — FAA-H-8083-3C
- AFH ch. 9 (p. 9-10) — FAA-H-8083-3C
- AFH ch. 12, Operational Procedures (p. 12-4) — FAA-H-8083-3C
- AIM 5-4-21 (Missed Approach) — AIM Basic 2/20/25 w/ Change 1 (8/7/25) & Change 2 (1/22/26)
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Hazard; How it shows up; Decision rules; Mitigations; The hazard
- Check your understanding with answers you can reveal