AA.VII.F.R1FAA-S-ACS-11A · Nov 2023Risk management
Planning for a powerplant failure inflight or during an approach.
Planning for a powerplant failure inflight or during an approach.
Bottom line
A single-engine go-around on final approach may not be possible. Most light-twins do not have the performance to climb on one engine with landing gear and flaps extended.
FAA references
- RMH ch. 3 (p. 3-4) — FAA-H-8083-2A
- AFH ch. 13 (p. 13-35) — FAA-H-8083-3C
- AFH ch. 3 (pp. 3-23–3-24) — FAA-H-8083-3C
- AFH ch. 9 (pp. 9-25–9-28) — FAA-H-8083-3C
- IPH ch. 1 (p. 1-26) — FAA-H-8083-16B
- AFH ch. 9 (p. 9-29) — FAA-H-8083-3C
- IPH ch. 6 (p. 6-15) — FAA-H-8083-16B
- RMH Glossary — FAA-H-8083-2A
Build understanding you can use
Unlock the full lesson and continue studying this element.
- Full teaching sections: Hazard; How it shows up; Decision rules; Mitigations; The hazard
- Check your understanding with answers you can reveal