AA.VII.E.K2FAA-S-ACS-11A · Nov 2023Knowledge

Go-around/rejected landing procedures with a powerplant failure.

ACS element text (the applicant demonstrates understanding of)

Go-around/rejected landing procedures with a powerplant failure.

Bottom line

A go-around is a normal maneuver that is used when approach and landing parameters deviate from expectations or when it is hazardous to continue.

FAA references

  1. AFH ch. 9 (p. 9-10) — FAA-H-8083-3C
  2. AFH ch. 9 (p. 9-11) — FAA-H-8083-3C
  3. AFH ch. 9 (p. 9-12) — FAA-H-8083-3C
  4. AFH ch. 9 (p. 9-29) — FAA-H-8083-3C
Members lesson

Build understanding you can use

Unlock the full lesson and continue studying this element.

  • Full teaching sections: What it is; Key points; How it is done
  • Check your understanding with answers you can reveal
  • Common mistakes paired with the FAA facts that correct them
View membership options